Eight buildings on UTSA Main Campus to have gas outage June 23
(June 18, 2012) -- Natural gas to eight buildings on the UTSA Main Campus will be turned off from 7 a.m. to 4 p.m., Saturday, June 23 to make repairs to a damaged gas line.
These buildings will have no domestic hot water during the gas outage:
- Business Building
- John Peace Library
- Multidisciplinary Studies Building
- McKinney Humanities Building
- Arts Building
- Science Building
- Biotechnology, Sciences and Engineering Building
- Biosciences Building
Operation of food service equipment and the emergency generator also will be affected by this shutdown.
For more information, contact Facilities Work Control at 210-458-4262.
Events
This event will acknowledge graduating seniors from the McNair Scholars program at UTSA before inducting the new cohort of scholars into the program.
North Paseo Building (NPB 5.140), Main CampusAt this memorable celebration, UTSA graduates will be introduced one-by-one to cross the stage and accept their doctoral degrees.
Arts Building Recital Hall, Main CampusRoadrunner Walk is an event for graduating students to have a memorable walk on campus to celebrate an important milestone and their achievements. Graduates will walk along the Paseo while being celebrated by the UTSA community, friends, and family members.
Student Union Paseo, Main CampusCelebrate the accomplishments of College of Education and Human Development, College for Health, Community and Policy, College of Sciences and University College.
Alamodome, 100 Montana St.Celebrate the accomplishments of Alvarez College of Business, College of Liberal and Fine Arts and Klesse College of Engineering and Integrated Design.
Alamodome, 100 Montana St.