<?xml version="1.0" encoding="ISO-8859-1" ?>
<!--  RSS generated by UTSA Today on Fri, 17 May 2013 20:50:01 PST -->
<rss version="0.91">
<channel>
<title>UTSA Today - Health, Safety and Environment</title>
<link>http://www.utsa.edu/today/</link>
<description>UTSA Today News</description>
<language>en-us</language>
<category>Health, Safety and Environment</category>
<copyright>Copyright The University of Texas at San Antonio</copyright>
<docs>http://backend.userland.com/rss</docs>
<lastBuildDate>Fri, 17 May 2013 20:50:01 PST</lastBuildDate>
<managingEditor>tim.brownlee@utsa.edu</managingEditor> 
<webMaster>ruben.ortiz@utsa.edu</webMaster>


<!-- Story Number 1--><item>
<link>http://alerts.utsa.edu/</link>
<title>Simulated tower crane rescue is May 19 at UTSA Main Campus</title>
<teaser>Emergency response exercise is 8 a.m.-5 p.m., Sunday, May 19</teaser>
<description></description>
<pubDate>2013-05-17 20:00:00.0</pubDate>
</item>
<!-- Story Number 2--><item>
<link>http://utsa.edu/today/2013/05/tobaccofree2.html</link>
<title>Reminder: UTSA begins transition to tobacco-free status June 1</title>
<teaser>Some surface lots are designated for smoking until going tobacco-free in 2014</teaser>
<description></description>
<pubDate>2013-05-16 17:00:00.0</pubDate>
</item>
<!-- Story Number 3--><item>
<link>http://utsa.edu/today/2013/04/serviceanimals.html</link>
<title>Reminder: UTSA creates new online training module on service animals</title>
<teaser>UTSA employees must complete brief online training module by May 30</teaser>
<description></description>
<pubDate>2013-05-15 10:00:00.0</pubDate>
</item>
<!-- Story Number 4--><item>
<link>http://facilities.utsa.edu/constnotices.htm</link>
<title>Maintenance: Sombrilla Plaza drains and pipes to be cleaned and repaired</title>
<teaser>At UTSA Main Campus, portions of plaza closed May 15-June 14</teaser>
<description></description>
<pubDate>2013-05-07 17:09:00.0</pubDate>
</item>
<!-- Story Number 5--><item>
<link>http://facilities.utsa.edu/constnotices.htm</link>
<title>Maintenance: Sidewalk west of south thermal plant will be blocked May 9</title>
<teaser>Closure at UTSA Main Campus is for removal of old equipment</teaser>
<description></description>
<pubDate>2013-05-07 17:00:00.0</pubDate>
</item>
<!-- Story Number 6--><item>
<link>http://bit.ly/163gQmt</link>
<title>UTSA Main Campus: UC study breaks and open study rooms May 6-10</title>
<teaser>At University Center: Quiet study spaces, plus free snacks and free chair massages</teaser>
<description></description>
<pubDate>2013-05-02 14:00:00.0</pubDate>
</item>
<!-- Story Number 7--><item>
<link>http://facilities.utsa.edu/constnotices.htm</link>
<title>UTSA Main Campus: John Peace Library food court remodel runs through summer</title>
<teaser>After May 10-28 closure, expanded salad bar and Papa John&apos;s will be added</teaser>
<description></description>
<pubDate>2013-05-02 13:40:00.0</pubDate>
</item>
<!-- Story Number 8--><item>
<link>http://facilities.utsa.edu/constnotices.htm</link>
<title>UTSA Main Campus construction: New recreational fields, May 6-Aug. 30</title>
<teaser>Work includes adding synthetic turf, sidewalks, storage buildings, landscaping</teaser>
<description></description>
<pubDate>2013-05-02 13:30:00.0</pubDate>
</item>
<!-- Story Number 9--><item>
<link>http://facilities.utsa.edu/constnotices.htm</link>
<title>UTSA Main Campus maintenance: Testing of sewage collection system</title>
<teaser>Testing, cleaning and repair of system will be May 1-Dec. 31</teaser>
<description></description>
<pubDate>2013-04-30 09:00:00.0</pubDate>
</item>
<!-- Story Number 10--><item>
<link>http://utsa.edu/today/2013/04/healthrecords.html</link>
<title>UTSA Student Health Services implements electronic health records system</title>
<teaser>Transition from paper to electronic health records begins April 29</teaser>
<description></description>
<pubDate>2013-04-26 15:00:00.0</pubDate>
</item>


</channel>
</rss>


