Aug 26, 2026

Unplanned AC Outage - MS First Floor

Due to emergency repairs, occupants on the first floor of the Multidisciplinary Studies Building (MS), primarily in the MS 1.02 area, may experience warmer than normal temperatures.
Aug 21, 2026

Fire Lane Closure at Fire Lane Closure at Basketball & Volleyball Training Center (BVTC)

The fire lane between the RACE and BVTC buildings will be closed Saturday, Aug. 22.
Aug 14, 2026

Notice: Resubmission Needed for 8/14-8/19 Facilities Work Requests

Due to the recent network outage, all work requests submitted through the Facilities Work Request Portal from Friday, Aug. 14, through noon Wednesday, Aug. 19, were lost and cannot be recovered.
Aug 6, 2026

Fire Lane Closure at Basketball & Volleyball Training Center

The fire lane at the Basketball & Volleyball Training Center (BVTC) will be closed on Friday, Aug. 7 due to construction activity.
Aug 6, 2026

Planned Lighting Outage - Buena Vista Building 1st Floor Corridors

Due to ceiling modifications on the first floor of the Buena Vista Building (BVB) at the Downtown Campus, corridor lighting will be unavailable from 9 a.m. to 4 p.m. Thursday, Aug. 6, through Friday, Aug. 7.
Jul 30, 2026

Unplanned Air Conditioning Outage at Frio Street Building

Due to mechanical issues, an unplanned air conditioning outage has occurred at the Frio Street Building (FS) on the Downtown Campus.
Jul 28, 2026

Planned Power Outage at BVTC, CDC and RACE

A planned power outage is scheduled for 6-10 p.m. on Wednesday, July 29, at the Basketball and Volleyball Training Center (BVTC), Child Development Center (CDC) and RACE buildings.
Jul 28, 2026

Academic Campus Elevator Inspections

Annual state-required inspections of academic campus elevators will take place Monday, Aug. 3, through Friday, Aug. 7, from 7 a.m. to 5 p.m. daily.
Jul 24, 2026

Scheduled Electrical Outage at Biosciences Building (Second Floor)

To support scheduled maintenance, an electrical outage is planned on the second floor of the Biosciences Building (BSB) from 5–8 a.m. Thursday, July 30.
Jul 24, 2026

Scheduled Steam Outage at Biotechnology Sciences and Engineering Building

To support necessary repairs, a steam outage is scheduled at the Biotechnology Sciences and Engineering Building (BSE) from 2 p.m. Friday, July 31, through 4 p.m. Sunday, Aug. 2.
Jul 22, 2026

Temporary Hydration Station, Water Fountain Closure - Durango Building and Annex

To support necessary upgrades, hydration stations and water fountains in the Durango Building (DB) and Durango Building Annex (DBA) will be unavailable from Tuesday, July 21, through Wednesday, July 29.
Jul 21, 2026

Bauerle Road Garage: Intermittent Power Outages July 23-30

Due to planned emergency phone upgrades, intermittent power outages can be expected at the Bauerle Road Garage (BRG) between 7 a.m. to 4 p.m. on weekdays from Thursday, July 23 through Thursday, July 20.
Jul 17, 2026

Unplanned Cooling Outage - Bauerle Road Garage

Due to mechanical issues, an unplanned cooling outage has occurred at the Bauerle Road Garage (BRG) on the Main Campus. During the outage, occupants may experience higher than normal building temperatures.
Jul 15, 2026

Unplanned Corridor Lighting Outage - Buena Vista Building

Due to unscheduled maintenance, hallway lighting on the third floor of the Buena Vista Building (BVB) at the Downtown Campus will be unavailable from 8 a.m. to 4 p.m. Wednesday, July 15, while corridor lights are being replaced.
Jul 9, 2026

Crosswalk Refurbishment Project Scheduled July 13-31

Facilities will begin a crosswalk refurbishment project on Main Campus roadways from Monday, July 13, through Friday, July 31. For your safety, please watch for posted barricades, signage, and traffic control personnel, who will direct pedestrian and vehicle traffic safely around the work areas.
Jul 2, 2026

Unplanned Restroom Closures at Frio Street Building

An unplanned restroom closure has occurred at the Frio Street Building (FS) at Downtown Campus due to emergency repairs. During the outage, restrooms on the building’s south side will be unavailable until repairs are completed.
Jul 1, 2026

Unplanned Water Outage - CAR, SFF, RWS

Due to emergency repairs, water is currently unavailable at the Center for Archaeological Research (CAR), Support Services Facility F (SSF), and the Lab and Waste Storage Building (RWS). Facilities is currently working to restore service as quickly as possible.
Jul 1, 2026

Unplanned Restroom Closures - Main Building

An unplanned restroom closure has occurred at the Main Building (MB) at Main Campus due to emergency repairs. Restrooms on the building’s east side will be unavailable until repairs are completed. The affected restrooms are MB-0.322, MB-0.324, MB-1.220, MB-1.222, MB-2.330, MB-2.328, MB-3.322, and MB-3.320.
Jun 29, 2026

Planned Natural Gas Testing - AET, BSE, HSU, SEB, STEP

Testing scheduled for 7 a.m. to 4 p.m. on Tuesday, June 30, will affect natural gas and heating hot water access for the following buildings: Applied Engineering and Technology Building (AET), Biotechnology Sciences and Engineering Building (BSE), H-E-B Student Union (HSU), Science and Engineering Building (SEB) and South Thermal Energy Plant (STEP).
Jun 29, 2026

Unplanned Restroom Closures at Frio Street Building

An unplanned restroom closure has occurred at the Frio Street Building (FS) at Downtown Campus due to emergency repairs. During the outage, restrooms on the building’s south side will be unavailable until repairs are completed.
Jun 25, 2026

Roof Repair Construction Noise - Frio Street Building

Due to roof repairs on the 4th floor patio of the Frio Street Building (FS) at the Downtown Campus, occupants may experience increased noise. Repairs will take place daily from 7 a.m. to 4 p.m., Thursday, June 25, through Friday, June 26.
Jun 18, 2026

Scheduled Deionized Water Shutdown at BSE

As part of an ongoing project, construction will be making changes to a deionized (DI) water line in the Biotechnology Sciences and Engineering Building (BSE). To perform the work, a shutdown to the DI water system in the BSE is scheduled to take place from 8 a.m. to 2 p.m. on Monday, June 29.
Jun 11, 2026

Unplanned Reverse Osmosis (RO) Water Outage - BSB, FLN

An unplanned reverse osmosis (RO) water outage has occurred at the Biosciences Building (BSB) and Peter T. Flawn Building (FLN) on the Main Campus. At this time, RO water is unavailable throughout both buildings. Facilities is currently conducting repairs to restore the RO water as quickly as possible.
Jun 4, 2026

TxDOT Update: I-10/La Cantera Ramp Closures

Beginning Monday, June 8, 2026, the eastbound I-10/La Cantera Parkway exit and entrance ramps will close and the eastbound I-10 entrance ramp just east of Camp Bullis Road will open. Drivers who use the I-10/La Cantera Parkway ramps when traveling to and from the Main Campus should plan ahead and use suggested detours and alternate routes.
Jun 2, 2026

Planned Steam Outage – Multiple Main Academic Campus Buildings [UPDATED]

As previously shared, planned natural gas testing is in progress on all academic campuses through Aug. 31.